
Gas Turbine Refurbishment
Masaood John Brown‘s customised workshop facility in Dubai, UAE, is fully equipped to perform a complete gas turbine refurbishment service for GE type Frame 3, Frame 5, Frame 6, Frame 7 and Frame 9 gas turbines.
Our single-source facility, offering over 1500 man years of OEM Engineering experience, offers services which include turbine engineering, component repair and replacement, new spare parts, rotor overhaul, gear-box replacement, generator inspection, turbine rewiring, instrumentation and control system upgrade, auxiliaries replacement, and procurement of prefabricated inlet and exhaust systems.
Gas Turbine Refurbishment
In a similar manner to a major overhaul, each turbine can be overhauled to any specification required by a client. In many cases, gas turbines are available overhauled and ex-stock ready for onward sale to power generators. Customers can therefore expect a quality service and rapid turnaround time and turbines are available overhauled and ex-stock ready to onward sale to power generators. Customers can therefore expect a quality service and rapid turnaround time as turbines are returned to a zero-hour rated condition.
- Full “major” overhaul at MJB Jebel Ali repair facility
- Rotor refurbishment to zero-hour rated condition
- Availability of new and refurbished component parts
- Gear box inspection and overhaul
- Generator inspection, maintenance and overhaul
- Turbine Re-wiring
- Control Panel Upgrade
- Control Cab refurbishment or replacement
- Inlet and exhaust plenum engineering and procurement
Situated in modern air-conditioned premises, and with recently installed multiple-rotor balancing equipment, Masaood John Brown offers a competitive alternative to purchasing new gas turbines on extended lead times.
A resident core of field engineers and an Ex-stock supply of rotating parts and components, ensure minimum response time in returning users equipment to service and commercial operation as fast as possible.